TABLE OF CONTENTS
7. ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE
8. IMPLEMENTATION STATUS
OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure
1 Project General
Layout
Figure
2 Air and Noise Monitoring
Locations
LIST OF
APPENDICES
Construction Programme |
|
Project
Organization Chart |
|
Action and Limit Levels for Air Quality and Noise |
|
Calibration Certificates of Monitoring Equipment |
|
Environmental Monitoring Schedules |
|
Air Quality Monitoring Data |
|
Noise Monitoring Data |
|
Event Action Plans |
|
Waste
Flow Table |
|
Environmental Mitigation Implementation Schedule (EMIS) |
|
Weather and Meteorological Conditions during Reporting Month |
|
Cumulative statistics on Environmental Complaints, Notifications
of Summons and Successful Prosecutions |
|
Summary of Site Audit in the Reporting Month |
|
Outstanding Issues and Deficiencies |
|
|
|
i.
The
Civil Engineering and Development Department HKSAR has appointed MateriaLab
Consultants Limited (MCL) to undertake the Environmental Team services for the
Project and implement the EM&A works.
ii.
This
Monthly EM&A report presents the environmental monitoring and audit works
for the period between 1 February 2018 and 28 February 2018. As informed by the
Contractor, major activities in the reporting month were:
Excavation
and laying of drainage pipe and manhole;
Seawall
modification works;
Construction
of tunnel box structure;
D-wall
construction works;
Pumping
test; and
Excavation
and ELS construction.
Breaches of the Action and Limit Levels
iii. No Action / Limit Level exceedance was
recorded for 24-hr TSP and construction noise at KTD1a, KTD2a and KER1b in the
reporting month.
Complaint,
Notification of Summons and Successful Prosecution
iv. No environmental complaint, notification of
summons and successful prosecution were received in the reporting month.
Reporting Changes
v. There was no reporting change in the
reporting month.
Future Key Issues
vi. The key issues to be considered in the
coming reporting month include:
Potential
environmental impacts arising from the above construction activities are mainly
associated with construction dust, construction noise, water quality, waste
management and landscape and visual impact.